ecl-logo Documentation
ECL`

PlotProtocolTimeline

PlotProtocolTimeline[Protocol]Timeline

plots the status timeline in Protocol.

Details

    Input
    Output
    General Options

Examples

open allclose all

Basic Examples  (1)

Creates a plot showing a protocol's current status over time as it proceeds from InCart to Completed:

Options  (8)

InstrumentCheckIns  (1)

Show each time the operator performed a check-in during instrument processing:

OperatorInterrupts  (1)

Show priority check-ins that the operator was pulled into:

ReadyCheck  (1)

Show periods of ReadyCheck->False with any instrument and/or materials limitations displayed on hover:

Repairs  (1)

Display any repairs needed for the protocol to move forward. Click on the point to print the underlying object below the plot:

Subprotocols  (1)

Displays the DateStarted and DateCompleted of all subprotocols completed by the protocol:

Tasks  (1)

Display every Engine task using the creation date of all TaskStart events:

Tickets  (1)

Tickets are displayed as red dots on the x-axis. Click on the point to print the underlying ticket below the plot:

Title  (1)

Provide a specific name for the plot. All plot titles copy themselves to your clipboard on click:

Messages  (1)

NoStatusLog  (1)

Prints a message and returns $Failed if given a protocol without any status information:

Last modified on Thu 25 Sep 2025 19:23:22